Table of Contents Table of Contents
Previous Page  25 / 90 Next Page
Information
Show Menu
Previous Page 25 / 90 Next Page
Page Background

2017

2018

3 PLANTS GOLD

1 LISI AEROSPACE - 2 LISI AUTOMOTIVE

7 PLANTS GOLD

4 LISI AEROSPACE - 3 LISI AUTOMOTIVE

8 PLANTS SILVER

4 LISI AEROSPACE - 4 LISI AUTOMOTIVE

12 PLANTS SILVER

4 LISI AEROSPACE - 7 LISI AUTOMOTIVE - 1 LISI MEDICAL

22 PLANTS BRONZE

8 LISI AEROSPACE - 11 LISI AUTOMOTIVE - 3 LISI MEDICAL

18 PLANTS BRONZE

10 LISI AEROSPACE - 6 LISI AUTOMOTIVE - 2 LISI MEDICAL

NEW OPTIMIZATION

PROCESSES

Just-in-time production tools (Kanban, generic Kanban

and CONWIP) have been strengthened to minimize the

work in progress and reduce production lead times. Two

new optimization processes have been deployed on the

sites: management control, which makes it possible

to set objectives at all levels of the company with daily

indicators and to set up a system for verifying compliance

with standards; the

kaizen

event, a pillar of the search

for performance by optimizing the organization of work.

The implementation of these tools comeswith a newLEAP

benchmark. The latter has been operational since 2019 for

the seven plants that have reached the “Gold” level for the

old benchmark. It opens new performance prospects and

will be rolled out across the sites as of 2021.

11

PLANTS

HAVE

REACHED

AHIGHER

LEVEL

IN2018

21