Table of Contents Table of Contents
Previous Page  41 / 78 Next Page
Information
Show Menu
Previous Page 41 / 78 Next Page
Page Background

LISI 2016 ANNUAL REPORT

I

37

HIGHLIGHTS

A SUSTAINED LEVEL

OF CAPEX

The LISI AUTOMOTIVE’s division good mastery of

working capital requirements (WCR) made it possible

to finance an investment level of €31.9 million

to support a number of operational development

projects (see also page 26) and implement of new

equipment, such as a new generation cold forging

press, digital multi-spindle machining centers, the

automation of line loading-unloading operations, or

a new generation of laser control systems and 3D

camera.

DASLE,

YEAR 1

Specialized in the manufacture of nuts and

mechanical safety components, the Franche-

Comté Dasle site completed its first year of

operation in its new configuration. The 14,000 m

2

site has been completely redesigned to streamline

and optimize all flows. 22 months of work without

production stoppage were necessary to ensure

the transfer from the old to the new site.

32

€M