BAR-SUR-AUBE

ROBOTIZATION

OF THE PILON 24

This year, the Bar-sur-Aubemarked a turning point with themodernization and the robotization

of the 16,000 Kgm forge cell. This pilot project, the last phase of which is due to be completed

in September 2018, aims to improve working conditions throughout the unit. It integrates a

systemof aspiration and filtration of smokes, the numerical control of the pieces of equipment,

automated lubrication and finally the robotization of the handling of the parts between each

operation, from the furnaces of heating to the deburring. A real technological challenge,

this last system relies on four robots with a carrying capacity of 500 kg. These developments,

which have led to the design of the pilot demonstrator of the solutions implemented in the

future Forge 2020 plant (

see opposite

), support the development strategy of the site, in

particular on the engine components.