NEW BUILDINGS

AT SAINT-OUEN L’AUMÔNE

A new building of 5,000 m

2

, called SOL3, was built on the site of

Saint-Ouen l’Aumône. It will absorb the ramp-up of new Airbus

programs, but also for the aircraft manufacturer Embraer,

Dassault and Comac or XJJ. This workshop has two production

lines for nuts – one Aluminum/Stainless Steel line and one

Titanium line – with a total capacity of 10 million units / month.

The grouping of the various means of production in an island,

by product rather than by technology, reduces the lead-time for

production and the response time.

Targets

Capacities

Productivity

Dematerialized flows

EXPANSION AND OPTIMIZATION IN MARMANDE

Several significant investments were made on the Marmande site.

One of these investments relates to the establishment of the lip

polishing robot for the A320neo. The automation of this operation,

initially handmade in 8 hours, removes a tedious manual task

exposed to musculoskeletal disorders and improves its quality

and productivity. The site also hosted a second Parpas machining

machine to adjust the dimensions of the A320neo’s lips after

the forming operation. The process used is adaptive: the 1,200

measurement points taken on the part help adjust and correct

the machining program of the part. This second unit completes

the production rate targets defined with Airbus and helps secure

the line. Regarding investments, one should also note the one

that relates to the 3,000 square meter expansion of the Carpète

site, which will allow the LEAP manufacture of motor drive edges

(forming, machining, manual and robotic polishing, dimensional

control) on new, better suited, premises.

Targets

Capacities

Modernization

Productivity

KICK-OFF OF THE FORGE 2020 PROJECT

The project to transfer the forge from Bologne (Haute-Marne) to

a new site, called Forge 2020, located about ten kilometers away,

was initiated in 2016. This major project represents an investment

of €150 million over 7 years (nearly €50 million for the real estate

alone) and will allow the creation in France of a global forge.

Established on 40,000 m

2

, it will benefit from modern, renovated

facilities and from futuristic production technologies (connected

machines, automated tooling changes, etc.). Energy efficient, it

will be organized following streamlined production patterns.

Targets

Modernization

Automation

Productivity